PUBBLICAZIONI 2001

P. LUNARDI E ALTRI
Bologna-Firenze, l’alta velocità nel rispetto dell’ambiente
Strade & Autostrade, 1-2001
P. LUNARDI E ALTRI
Modern tunnelling in Italy for the high speed railway line Atti del VI Simposio Internazionale BAUMA 2001, Monaco, 2 ÷ 8 aprile 2001
P. LUNARDI
Progetto e costruzione di gallerie – Approccio ADECO-RS
Quarry and Construction, maggio 2001
P. LUNARDI
Approccio ADECO-RS: risoluzione delle problematiche relative al sottoattraversamento dell’autodromo internazionale del Mugello in condizioni di ridotta copertura
Quarry and Construction, maggio 2001
P. LUNARDI, F. LEONI, A. VALENTE
Full scale test of grouting and freezing for new extension of Rome underground, line B1
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI E ALTRI
Action to reduce the hydrogeological impact produced by underground works
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI, R. BINDI
The evolution of reinforcement of the advance core using fibre glass elements for short and long term stability of tunnels under difficult stress-strain conditions: design, technologies and operating methods
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI, G. CALCERANO
A new construction method for widening highway and railway tunnels
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
B. CAVAGNA, A. DE RISI, T. LALLI, G. POMICINO, P. LUNARDI, F. RUSSO C. VIGGIANI
The lower stretch of line 1 of Naples underground
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI E ALTRI
Aspetti progettuali e costruttivi affrontati nell’ambito dei lavori per il raddoppio della linea ferroviaria Bicocca-Siracusa, tratto Targia-Siracusa
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI, G. CASSANI
Construction of an underpass at the Ravone railway yard in the city of Bologna: aspects of the design and construction
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI, G. CASSANI
Construction of an underpass at the Ravone railway yard in the city of Bologna: aspects of the design and construction
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI
The ADECO-RS approach in the design and construction of the underground works of Rome to Naples High Speed Railway Line: a comparison between final design specification, construction design and “as built”
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI, A. FOCARACCI
Risk assessment in tunnel design
Atti del Congresso Internazionale su “Progress in Tunnelling after 2000”, Milano, 10 ÷ 13 giugno 2001
P. LUNARDI
Attendibilità della progettazione: risultato dell’applicazione dell’approccio ADECO-RS per il progetto e la costruzione delle opere in sotterraneo della linea ferroviaria ad alta velocità Roma-Napoli. Confronto tra i progetti esecutivo, costruttivo ed “as built”.

Strade & Autostrade, 5-2001
P. LUNARDI, G. CASSANI
Reliability rules at Dolonne
Tunnels & Tunnelling International, Novembre 2001
joomla templategratis template joomla
2025    ©  Pietro Lunardi

Questo sito web utilizza cookie tecnici per assicurare una migliore esperienza di navigazione; oltre ai cookie di natura tecnica sono utilizzati anche cookie di terze parti. Non vengono utilizzati cookie di profilazione. Se prosegui nella navigazione di questo sito acconsenti all’utilizzo dei cookie. Informativa Cookie